Reconstructing the AEC Practice: Success in AECO, BIM & Revit
The transition into BIM is long a foregone conclusion for AEC firms, both large and small. Once past the initial choice to leave CADDrafting and implement BIM, firms are left with new software and old processes. Creating and developing new (BIM) processes and restructuring existing CADD and business strategies are fundamental steps to undertake for successful transition into and collaboratively working in the modern AECO Design and Construction marketplace.
Four quick reasons why else we need to restructure:
- CAD work doesn't "require" a good architectural practice, in and of itself, and BIM does.
- Every (arguably every) CAD process will not be effective, let alone work on a BIM project.
- BIM is a revolution, not an evolution, to processes.
- We’d like to stay in the AECO industry.
BIM teams and firms, both large and small, that have been “doing” BIM for a while have found success, in large part due to creating and following clearly defined, rigorous, and robust processes and guidelines. The word “standards” may be used herein, but until everyone uses the same ones, I suggest we use a different word ;)
A highly organized practice is required to get the right work done at the right time(s). BIM project success requires much more than simply excelling at software and it is by no means a new drafting tool.
“Honour Thy Error as a Hidden Intention” - From “Oblique Strategies,” by Brian Eno and Peter Schmidt
“Without Follow-Through, Intentions are Meaningless” - Jay Zallan
BIM project teams can be thought of in the same manner as sports teams. As an example, let’s look at the architectural team. Each person—from the owner (Associate, let’s say) and manager (PM) to players (Design & Production)—has very specific tasks and responsibilities. When everyone is on the same page, then “championship, here we come.” But if, for instance, there is a designer who does not deliver within the planned timeframe, leaving no time for production to incorporate the designs, then the team can expect negative, costly impacts.
BIM requires that people step out of existing comfort zones and actually and continuously learn, grow, and communicate.
If team success depends on everyone doing their part, at the right times, then they need to practice. There is a reason we "practice" our crafts—we need to stay sharp and at the very top of our game, if we want to be as successful as possible, that is.
When thorough process plans are created for each aspect of our team and timelines and responsibilities are clearly defined and followed, then teams will be afforded a winning environment. There are always outside forces acting against our plans, so flexibility is necessary, too. But with great team communication, active management, and coordination efforts, "the promise of BIM" can truly be achieved.
Just Throwing People at it Doesn’t Work in BIM
In CAD many of the workflows often employed are now viewed as inefficient. One that masks even its own inefficiency is the "just throw extra staff at it to get it out the door" workflow. BTW: that one is fundamentally not a production-fail; rather it is a management-fail.
Responsibility must be taken for successes as well as failures or the processes will never be improved. Struggles on projects need to be captured and used to benefit future projects, not simply hidden away and ignored.
If that kind of “throw staff at it” approach is used on BIM projects, for whatever reason, that inefficiency becomes a glaring indicator that effective management processes weren't followed. Throwing extra staff at BIM production “cold,” without the new team members understanding the project, can be extremely dicey at best. Many times the result will be an enormous amount of extra time spent fixing absolutely avoidable mistakes.
In BIM there are pitfalls as well, like when modeling, for instance. Modeling can be a very hypnotic endeavor; teams can find themselves meandering back and forth in the model losing sight of the bigger picture: schedules, time, and money. Following rigorous processes can keep that in check.
The point of BIM and the extended approaches of IPD, after all, can be thought of as processes that enable more efficiency and better executed projects, with fewer RFIs, etc. AEC not only wants this, but it can be argued that it needs it.
A Clear Understanding | Transformation
So, how does a firm become successful at transforming its processes for BIM? Well, first get clear about what works and what doesn’t. Adopt willingness for change and search out and then embrace new ways of production, coordination, and presentation. Second, create project guidelines and systems that will help teams manage the project objectives and overall firm goals.
Change can come in many forms, like that of allowing existing processes to evolve, such as production and design schedules, management styles, output—all areas that are affected.
The “Chasing CAD” Dilemma: a “for-instance.” The shape of a tag never made a firm any money that I am aware of, but blindly chasing them around sure has lost money for the firm.
What to focus on is important, but doing so at the proper time is equally important.
Chasing CAD symbologies is not always recommended; rather, allowing an evolution of symbols, etc. in BIM is much more desired; especially since tags, keynotes, and such can be associated with actual building elements giving the project much better data with less need of QA/QC when compared to CAD. Output is another evolution that, while it can be distinct from the look of CAD in many ways, it can also be extraordinarily better in both the look as well as informational and coordination value. BIM can tell a better story than CAD.
The past may inform part of our future processes, but be cautious and skeptical of those ideas such as “Why? Because we have always done it that way.” Those types of reasons are pitfalls to avoid at most every turn.
The “You Can’t Do it in BIM” Fallacy and “We’ve Always Done it That Way”
People will often say things like this, and while it seems natural for humans to resist change, it is invariably a mindset that needs to be navigated around and debunked. These roadblocks are simply excuses for people to continue on the same inefficient path they currently travel.
Anything Done in CAD Can Be Done in BIM, Just Better!
If anyone ever tells you that you can’t do something in a BIM authoring software and it’s related to our necessary design work, etc. then there are a few explanations; either:
- They are unaware of how to do it; or
- They are lying
(If anyone can prove another reason, I’d love to explore it.)
Yes, anything that can be done in a CAD drafted project can be done in BIM projects and usually done better. Firms may need to learn new approaches for BIM, but that is what will allow growth of our industries and allow better projects to be built. BIM authoring tools work just fine and it is mainly inexperience that creates issues and confusion.
Recovering from Addictions to CAD
The addiction to CAD is perhaps the single most difficult obstacle that BIM adopters will encounter when transitioning.
CAD addiction needs to be acknowledged and actively mitigated if a full BIM transformation is to take place. It may seem cold-hearted, but where are all the hand drafting AEC firms today? They are either using computers or are in other lines of work.
CAD may be around in many industries for a long time to come, but in AEC it will be replaced by BIM and for many companies it already has.
Some people, consciously and unconsciously, use CAD in a similar fashion that children use security blankets. Existing workflows can be held onto very tightly, and cause a lot of problems for the transitioning firm.
There can be factional talk among staff—usually under the radar—where they try to build consensus for their “Pro CAD/Anti BIM” positions, which is nothing more than subverting the firm’s intentions and goals.
Some have even created scenarios where they subvert the BIM processes to ensure failure; that way they feel they can go back to using CAD.
These people may even ask for training and advice, get the training and advice they’ve asked for, then not use it. Then they say, “See, BIM doesn’t work,” even though BIM would have worked perfectly if they followed procedures. It can be easy to hide these types of sabotage if there is an environment of unwanted change.
Envisioning Transition
There are four main components to a restructuring plan: Assessment, Planning, Creation, and Validation.
Assessment
Assessments will give quite a bit of insight into what is necessary to change or refine during the transition and restructuring. Assess the staff, existing systems, and infrastructure, as well as project procedures. The assessments will be used to give a good baseline of the “state of the firm,” its capacity to absorb change, any fiscal impacts, everyone’s mindset, and so on.
We cannot effectively create a better future if we don’t honestly understand the past and present.
Assessing Staff: what do we feel about our practice and process
Create a 10 +/- question interview, given to all staff including management. Ask about what works in the current process, what doesn’t, who they think are the best teammates, how do they like the infrastructure, who they feel may hold the process back, etc. Be sure to ask, “Who is ‘that’ person and why?” There is always a ‘that’ person (or people) in every firm, and although there may be several such people, there will usually be some consensus.
Make the interview setting safe and confidential—do not tie answers to names. We do not want to interrogate, we simply want to get the staff’s honest feelings about the state of affairs. These staff assessments will inform potential champions as well as gatekeepers, etc. by connecting “actions” to issues/answers.
Assessing Goals: What do you want and when do you want it?
Because we define the goal of this “project” as being “restructuring our AEC processes for BIM,” then the next step is to define the objectives. This is the point to take a good, hard, objective look at current processes and map them out visually so the current approaches can be used to inform BIM approaches.
Storyboard Your Process. Providing an interactive, live assessment can be done in several ways: digital tools such as traditional process map or mind-mapping software can be used to create process maps, although I suggest starting off by using 3x5 cards posted on a wall (if there is ample room, of course). A digital set of process maps will be created later on, but the storyboard approach adds many benefits including immediate collaboration where people can add all varieties of documents, notes and drawings, etc. Include the entire staff in divining the process maps, so expertise at all levels is included and every possible measure is addressed.
Set up the storyboards and refine your “map” until you feel it addresses the entirety of your current process; once completed you can begin to map out the new processes. When each process is fully vetted, then input them into digital process maps to be used in later phases of the restructuring and documenting.
Process maps will include all the steps taken to complete an AEC project in your firm, practice area, or team structure. Provide time to review these; add color-codes for prioritization and distinguish items such as “what works” and “what the pain points have been.”
The BIM process map can be started by using copies of some of the items from the current process map: use colored strings to define critical paths or connections, etc. Those paths can be translated to the digital copies as well.
The BIM process plans require different input than do CAD processes; this time you must include people who have extensive knowledge of both BIM production and project execution. The team that creates the new processes wants to incorporate all levels of project execution, including technical and managerial. If there is no one on staff who has BIM leadership experience on the kinds of projects your firm produces, then go get some. Not knowing what you do not know can create failure; bring in new staff or consultants if that is necessary to help you understand unknown or new BIM processes.
Transformation
Restructuring a practice to incorporate new processes requires many levels of buy-in and transformation—both personal and professional. Transformation and willingness to change, etc. comes differently for everyone and needs to be figured into the restructuring plans.
Anyone who has studied transformation understands that it is primarily important to figure out what goals are truly desired, then to create plans intended to accomplish those goals, and finally commit to and complete the necessary actions in those plans.
Gaining buy-in can be increased by working with the staff on agreeing that what they want is what’s best for the firm, since that can become what’s best for them as well.
If staff openly and publicly agree that they want to be part of the firm’s success, and the firm openly and publicly states that they want to better the firm through refining its processes for BIM, then it becomes obvious and natural for the staff to do what it takes to accomplish that goal: namely buy in and follow the plans that are to be created.
If there is no implicit, open, and public agreement between the ownership, management, and staff, then the restructuring itself may not be efficient and will probably speak to how projects will run.
The public nature of these agreements can provide an environment of empowerment and self-oversight. Conversely if people say they buy in; yet don’t follow through on their agreement, then that is necessary to know and provides an opportunity to honestly deal with whatever the issues may be and rectify them, rather than be held hostage by them.
If it comes to pass that there are any parts to the plan that have not been completed when they were planned to be, these objectives either need to be re-committed to and completed, or if found to be unnecessary, dropped from the plans. Either way there is a mechanism for responsible and managed follow through.
Planning (for Success): What Will Be Done, When, By Whom
A structured plan is necessary for success in anything and BIM is no exception. An Implementation Plan is used to provide on-demand insight into where the project is at any moment and can be developed to become recipes for project performance. These plans should encompass the gamut of necessities, from an overall strategic plan (the 10,000-foot view, or macro) all the way to task lists for every possible consideration (micro). The plans will want to include infrastructure, staffing, training, implementation timelines, fiscal plans, etc. Basically all of the “what’s, when’s and who’s.”
Successful BIM projects have team members who have intimate knowledge of the design, production, and documentation processes used. By documenting the project execution tasks, management can predict staffing needs and budget impacts proactively with more predictable results. As we saw earlier, unplanned up-staffing can throw unnecessary trouble into the mix and should be avoided.
The Plan
Knowing the end result is everything—or at least knowing most of what the desired end product is. With comprehensive assessments informing our understanding of what to plan for, we can create a host of documentation that can both explain what needs to be done and when/by whom, as well as provide management tools to keep items from falling through the cracks.
Good planning documents will enable prioritized workflows, tighter timelines, and overall project health because knowing what still needs to be done at any one time is critical. BIM and IPD projects benefit from, and quite often require, that process maps and thorough/granular plans be generated throughout the project lifecycle, from preliminary submissions forward. The better we get at planning, the better our potential for success will be.
The AIA E203 Building Information Modeling Exhibit is one of the great starting points for helpful, if not necessary, documents that BIM teams use. Developing similar types of matrixes can be used to create overall project checklists, as well as the team-specific plans all the way to production staff plans, etc. These can be thought of similar to the “Cartoon Set” and can/should be tied in to one another.
Creating a toolset for teams that use task lists interlinked with project schedules will offer even greater opportunities to manage projects and teams in order to keep everything running smoothly. Capturing the finite elements of a project and linking that with time and staff will give management a clear understanding of what needs to be done and when.
There are many available resources that can help in understanding and creating process maps; therefore, a list of links is provided at the end of this article.
Once the plan is in place it is time to do. Implement the plan, making everything necessary for staff to understand what the goals are, etc., then validate the plan for future repetition and you’re on your way to restructuring from old processes to new.
Plan Ideas
- What is the goal?
- What are the objectives?
- What will be done the same?
- What will be done in new ways?
- What infrastructure is already in place?
- What infrastructure is needed anew?
- What staff is already in place?
- What staff may be needed anew?
- What are the timeframes?
Create
Do the things you've planned:
- Methods
- Templates
- Standards
- Documenting the process
- Toolsets
- Checklists
- Project binder
- Staff responsibilities
Validate | Considerations
- QA & QC of the entire process
- What went well?
- What were the pain points?
- Adjust the plan for future projects
Many firms initially believe that they can learn BIM simply by buying the authoring software and figuring it out; this usually yields inefficiency and can unnecessarily hold back successful BIM for years, even with basic software training.
BIM is not software.
BIM is not process.
BIM is Data Modeling, where associations are created between building objects, their real informational values; project timelines, and teams. BIM is not simply a 3D model of a building—that is a sculpture. BIM combines all of the data from concept to final construction and operations.
Detailers, for instance, cannot begin late in the DD or CD timeline and hope for success; detailing needs to be involved with the project throughout. Design is another main area where teams can lose time and money: If there is no “pencils-down” or if it is too late, then there is no time for production to do their work, let alone provide coordinated and quality controlled work.
The restructuring of an entire firm is no different than restructuring a small part of the delivery process—just bigger, with more variables. The following is an example of a restructuring approach for one part of an overall project process: Detailing.
Extrapolate the ideas herein for recreating a BIM workflow that enables your firm a better chance at efficiency and success.
Tasks, Projects and Production
When Project or “Task-based” schedules are created they must be inferred to include every possible factor, beyond simply the individual task itself. These factors include the Project or Task’s deadline, Design time*, QA/QC, Production, and Transmission.
The subsequent list is an abstracted analysis of what to schedule for and the potential factors involved.
Project = (Design + QA/QC) + (Production+ QA/QC) + (Submission + Contingency)
Design = (Phase specific Completion Date – Pencils Down)
Production = Modeling + QA/QC + Documentation + QA/QC
“Pencils Down” = Completion Date – (Design QA/QC + Final Production + Final QA/QC + Submission)
QA/QC = (Review + Markup) + (Revision + Re-Review…)
Contingencies = Estimated % of project time for unforeseen delays, etc. (judgment call)
Submission = Check Print + (Final QA/QC + Final QA/QC Revisions) + Printing + Transmittal
Pencils-down should be considered one of (if not “the”) most honoured factors in a project, if collaboration and coordination are going to be involved. If a project is to be delivered as coordinated and complete, then allowing production, revision, and verification time after the design is finished is vital (read as: VITAL!!!).
One large and impactful stumbling block to budget is when the project is not properly executed within the schedule.
A recurring impediment to completed, coordinated, and on-budget projects in AEC is when one part of a team does not leave enough time for necessary, future work such as if a Design team is not completed by the end of DD. Remember: that is what DD stands for—Design Development.
There are always items that need to change after they are planned for and although this may need to happen once in a while, if unplanned changes are too numerous and become the status quo, then success can only be tenuous at best and definitely not the desired way to run a business.
Another example of negative impacts to a project is in the design of Details. This is equally important a part of a project that needs to have a pencils-down date (or dates).
Details are to be “designed” progressively throughout a project, but each phase’s details need a schedule that allows for both creation and production (including all the QA/QC and revisions, etc.).
The first-pass details are best designed early on in a project; beginning about 30-50 percent SD and progressively developed through DD and optimally having a detail-design, final pencils-down before 75 percent CD.
The third example of negative impacts to schedules is the “Meandering Production Team.” If a team is allowed to work without a concise plan of attack derived from the comprehensive project schedule and broken out into more and more granular, “task-to-date” sub-plans, then the project can expect similarly undesired results.
The ‘Efficiency’ Bottom Line
Create an Environment of Efficiency to Deliver Success
- Create good plans and manage them closely for all aspects of the process: Design, Detail & Production, Coordination, and Submission.
- Execute the plans and make people accountable and empowered. Do exactly what is planned, no more and no less (unless the plan is changed).
- Keep teams on point by eliminating unnecessary meandering and overworking; ensure that the team holds to tight, rigorous, and agreed-upon managed timelines.
Concluding Thoughts
We have focused on restructuring processes for BIM projects. Such restructuring, being broken out into several overarching themes, all work toward the bottom line: Success. The philosophy of “planning the work and working the plan” is a fundamental principle to follow for overall project success, based on a “Do What We Say, Say What We Do” approach.
If built on good planning, teamwork, management, communication, and follow-through, when properly administered, a BIM process will realize successes for the entire AECO team.
Helpful Links (these may change as time goes on):
(Some) BIM Standards
NIBS (Goto Resources)
AIA E203 BIM Exhibit
http://www.aia.org/contractdocs/training/bim/AIAS078742
UK Construction
Industry Council (CIC): http://www.cic.org.uk/
BIM Execution, Planning
http://bim.psu.edu/Intro/Resources/default.aspx
COBIE Tools
Process Mapping
IDM: PDF Direct Download
IPD
IPD Guide: http://www.aia.org/contractdocs/AIAS077630